SRC is fully experienced in the installation of underground cisterns for fire protection, potable or non-potable water storage or sewer applications and Containment Solutions.
SRC has installed fire protection cisterns for Platte Canyon, Elk Creek, Evergreen, Inter-Mountain and North Fork Fire Departments. All cisterns, whether fiberglass or steel, are installed and completed according to the individual fire districts requirements with special bedding material, dry hydrant heads, man way openings and venting tubes.
Top three reasons to use SRC excavating services
Wide range of experience preparing for and installing this type of wastewater treatment equipment.
Competitive, no surprises bids!
The right equipment for the job.
Capabilities
Fire Cisterns
Mountain fire protection is becoming a serious concern of mountain home owners not only for the purpose of safety but also for insurance purposes as insurance companies are becoming increasingly concerned about fire protection issues before issuing a policy. In other words, you need a year-round water source for fighting fire on your property. Underground cisterns are one of the the possible solutions to keeping your home safe and insurable.
Reconditioned Fiberglas Cisterns (When available)
We will furnish and install previously used and reconditioned vapor-free Xerxes™ cisterns which will cut your construction costs in half versus a new cistern tank.
Potable Water Storage
We have previously installed several underground potable water storage tanks, and use only NSF certified tanks and fittings that meet ANDI/NSF61 standards for drinking water system construction components. These solutions can also reduce the strain on your water well.
SRC excavating services were used for site preparation and installation.
Windy Peak Outdoor Educational Lab
Jefferson County Schools, Bailey, CO Installation of two underground water storage tanks, upgrade existing utilities, installation of new septic tank with dosing siphon, dam construction.
Pine Family Entertainment Center
Pine Junction, CO Demolition of previous building, foundation push-out for new building, fire cistern installation, Advanced Treatment Septic System, parking area.
* means the field is required
* Name
Title
Company
Address
* E-mail
* Phone
12,000 gallon septic tank with Biotube™ effluent filters installed at YMCA Camp Shady Brook