Location:13710 Black Forest Highway Black Forest, CO 80908 Owner:Academy School District 20 Construction Management:Mr. Roy Spellman 719-234-1607 Construction Manager for Project 10221 Lexington Drive Colorado Springs, CO 80920 Engineer:Kiowa Engineering - Glenn C. Crissey, PE 1604 21st Street Colorado Springs, CO 80904 719-630-7342 Engineer / Distributor:SCO Enterprises, Inc. Roger Shafer PE P.O. Box 1411 Conifer, CO 80433 303-697-9404 Installer:SRC Enterprises, Inc. P.O. Box 166 Pine, Colorado 80470 303-838-4446 | Operator:Aqua Test - Woodland Park, CO As part of the many improvements to Edith Wolford Elementary School in Black Forest, Colorado, a new wastewater treatment system was installed during summer, 2004. The site is underlain by clayey soils and sandstone bedrock. Three previously installed drain field upgrades failed to perform. It was decided to treat the school's wastewater to a very high degree to allow for surface discharge under an NPDES Permit. The treated effluent flows through a UV disinfection system before discharge into Kettle Creek. Summary of System:Installation Start Up Date: August, 2004Collection System: Gravity Sewer to Septic TanksDesign Flow: 11,800 GPDTreatment System:- 1-35,000 gallon Xerxes septic tank
- 1-8,000 gallon Xerxes recirculation tank
- 6-AX 100 AdvanTex Filters
- 2-Sanitron UV disinfection lights
- 1-Orenco TCOM telemetry control panel
Dispersal System: Subsurface discharge to Kettle Creek tributary per NPDES Permit.
|